| 10 TON BASE |
![]() Unloading, transporting and reassembling a vintage Russian spacecraft for a exhibit at the St. Louis Science Centre. ![]() Bissel Point Waste Treatment (St. Louis, Missouri) Installing 16 water filters (18,000 lbs. each). The filters were lowered into a pit. Low headroom situation. The Bissel Point crew determined that the Mini Jacks completed the job in 1/3 of the time that other methods would have required. |
|